{"id":20152,"date":"2023-06-28T07:54:38","date_gmt":"2023-06-28T07:54:38","guid":{"rendered":"https:\/\/www.mup-group.com\/?p=20152"},"modified":"2023-06-28T07:54:38","modified_gmt":"2023-06-28T07:54:38","slug":"hochwasserrueckhaltebecken-dortmund-ellinghausen","status":"publish","type":"post","link":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/hochwasserrueckhaltebecken-dortmund-ellinghausen\/","title":{"rendered":"Flood retention basin, Dortmund-Ellinghausen"},"content":{"rendered":"<p>As part of the ecological reorganisation of the main course of the Emscher, the Emschergenossenschaft is having a flood retention basin (HRB) built in the Dortmund district of Ellinghausen. In future, the \"HRB Ellinghausen\" is to provide a total retention area with a retention volume of approx. 1.5 million m\u00b3 in conjunction with the neighbouring \"HRB Mengede\".<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2023\/06\/HRBE_IMAGE01-scaled-1.jpg\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.mup-group.com\/wp-content\/uploads\/2023\/06\/HRBE_IMAGE01-1024x768.jpg\" alt=\"\" class=\"wp-image-20154\" width=\"768\" height=\"576\"\/><\/a><\/figure>\n<\/div>\n\n\n<p>With an excavation area of almost 25 hectares, an excavation volume of over 1 million cubic metres of soil and an excavation depth of up to 6 metres, the flood retention basin will make a significant contribution to flood protection for the towns located along the main course of the Emscher. For the construction project, 3 separate individual basins were initially excavated from 2013 to create the so-called intermediate state. The northern basin section C was already completed in 2019; for the final construction of the southern basin sections A and B, the remaining embankments (\"Rehnen\") are currently being removed so that the final structural state of the HRB-Ellinghausen will be reached shortly.<\/p>\n\n\n\n<p>The Emscher, which was straightened during industrialisation, will meander through the basin as part of the final expansion by excavating a new riverbed. Alternating between low and high flow rates of the Emscher, the retention basin will take on a floodplain-like character.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2023\/06\/HRBE_IMAGE03-scaled-1.jpg\"><img decoding=\"async\" src=\"https:\/\/www.mup-group.com\/wp-content\/uploads\/2023\/06\/HRBE_IMAGE03-1024x768.jpg\" alt=\"\" class=\"wp-image-20155\" width=\"768\" height=\"576\"\/><\/a><\/figure>\n<\/div>\n\n\n<p>For more than 10 years, TABERG Ingenieure GmbH has been supporting the large-scale project for the construction of the \"HRB Ellinghausen\" with both planning and technical expertise. All services relating to soil management, geotechnical implementation support and construction supervision \/ site management have been provided in full by TABERG Ingenieure GmbH to this day.<\/p>","protected":false},"excerpt":{"rendered":"<p>As part of the ecological reorganisation of the main course of the Emscher, the Emschergenossenschaft is having a flood retention basin (HRB) built in the Dortmund district of Ellinghausen. In future, the \"HRB Ellinghausen\" is to provide a total retention area with a retention volume of approx. 1.5 million m\u00b3 in conjunction with the neighbouring \"HRB Mengede\". With an excavation area of almost 25 hectares, an excavation volume of [...]<\/p>","protected":false},"author":3,"featured_media":20153,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-20152","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts\/20152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/comments?post=20152"}],"version-history":[{"count":0,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts\/20152\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/media\/20153"}],"wp:attachment":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/media?parent=20152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/categories?post=20152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/tags?post=20152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}