{"id":10108,"date":"2021-06-01T16:31:43","date_gmt":"2021-06-01T16:31:43","guid":{"rendered":"https:\/\/www.mup-group.com\/?p=10108"},"modified":"2021-06-01T16:31:43","modified_gmt":"2021-06-01T16:31:43","slug":"duesseldorf-neuer-wohnraum","status":"publish","type":"post","link":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/duesseldorf-neuer-wohnraum\/","title":{"rendered":"M&amp;P D\u00fcsseldorf: New living space in D\u00fcsseldorf city centre"},"content":{"rendered":"<h1><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-10110 size-medium\" src=\"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1-300x300.jpg 300w, https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1-1024x1024.jpg 1024w, https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1-150x150.jpg 150w, https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1-768x768.jpg 768w, https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/06\/InDesign_Post_quadrat_Template-1.jpg 1440w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>In the immediate vicinity of D\u00fcsseldorf's Am Wehrhahn S-Bahn station in the city centre, a total of 450 flats with 220 underground parking spaces are currently being built on an area of approx. 18,350 m\u00b2. Back in 2018, Mull und Partner Ingenieurgesellschaft drew up a pollutant register and a demolition and disposal concept for the former buildings on the Worringer Stra\u00dfe \/ Gerresheimer Stra\u00dfe site. Based on this concept and the subsequent invitation to tender, the former buildings were demolished in the same year.<\/p>\n<p>This was followed by the preparation of the invitation to tender for the construction of the excavation pit and the expert support during the execution phase. To ensure proper recycling and disposal, the employees of the D\u00fcsseldorf branch worked closely with the client, VIVAWEST, and the responsible authorities to develop a concept for sampling the excavated material and coordinated the necessary excavation and the professional installation of the supplied material with the specialist company carrying out the work.<\/p>\n<p>The excavation pit was completed in summer 2020. Building construction is currently progressing rapidly. Even after the construction pit has been completed, Mull und Partner Ingenieursgesellschaft will of course be available to the client for any questions that arise during the further course of construction.<\/p>\n<p>Find out more about our work and projects and follow us:\u00a0<a href=\"https:\/\/www.linkedin.com\/company\/mup-group\">\u00a0\u00a0<\/a><a href=\"https:\/\/www.linkedin.com\/company\/mup-group\"><img decoding=\"async\" class=\"alignnone wp-image-9561\" src=\"https:\/\/www.mup-group.com\/wp-content\/uploads\/2021\/03\/61109-300x300.png\" alt=\"\" width=\"25\" height=\"25\" \/><\/a><a href=\"https:\/\/www.facebook.com\/mullundpartnergruppe\">\u00a0\u00a0<img decoding=\"async\" class=\"alignnone wp-image-9562 alignleft\" src=\"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2021\/03\/f_logo_RGB-Black_1024-e1614850103700.png\" alt=\"\" width=\"25\" height=\"25\" \/><\/a><\/p>\n<p><strong>#mullundpartner #engineeringforabettertomorrow #whatwedo #d\u00fcsseldorf #neuerwohnraum #vivawest<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>In the immediate vicinity of D\u00fcsseldorf's Am Wehrhahn S-Bahn station in the city centre, a total of 450 flats with 220 underground parking spaces are currently being built on an area of approx. 18,350 m\u00b2. Back in 2018, Mull und Partner Ingenieurgesellschaft drew up a pollutant register for the former buildings on the Worringer Stra\u00dfe \/ Gerresheimer Stra\u00dfe site as well as a demolition and [...]<\/p>","protected":false},"author":3,"featured_media":10110,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34,28],"tags":[],"class_list":["post-10108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bau-und-projektmanagement-geschaeftsbereich","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts\/10108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/comments?post=10108"}],"version-history":[{"count":0,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/posts\/10108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/media\/10110"}],"wp:attachment":[{"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/media?parent=10108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/categories?post=10108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging-mup-group-wordpress.rz.mup-digital.com\/en\/wp-json\/wp\/v2\/tags?post=10108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}