Expertise: Bau

The project includes additional pollutant investigations, expert support for the remediation of pollutants, demolition, gutting and excavation and is expected to run from 2020.
The project comprises the development of demolition concepts as well as the expert support of pollutant remediation, gutting and demolition, with a time frame from 2017 to probably summer 2022...
In 2018, an orientating investigation of the Wustrow Z3 drilling mud pit near Bösel in Lüchow (Wendland) was carried out as part of a historical exploration and orientating investigation.
From September 2019 to January 2020, an orientating environmental investigation was carried out for two contaminated sites in Tündern listed in Lower Saxony's contaminated site register. The measures included sampling, investigation.
The project comprised Phase I in accordance with the BFR BoGwS, with archive research, aerial photo analysis, site inspections and the development of an orientating investigation concept (OU concept) for a plant that was to be built by...
In 2020, an exploratory investigation was carried out in accordance with the construction guidelines for soil and groundwater protection. The focus was on a former site firing range of the German Armed Forces.
In 2020, an exploratory investigation was carried out in accordance with the construction guidelines for soil and groundwater protection. The focus was on a former site firing range of the German Armed Forces.
Since 2009, our field of activity has included explosive ordnance clearance, construction site preparation, demolition, contaminated sites, unsealing and soil and waste management. We offer comprehensive planning services in accordance with the federal government's working guidelines, including...
From 2016 to 2018, we provided consulting and planning services as part of the explosive ordnance clearance at Versmannkai Ost in the Elbbrücken neighbourhood of HafenCity. This.