m&p-logo

M&P Osnabrück: DB extension line OL-WHV: Even oystercatchers feel at home here!

InDesign Post quadrat Template 11

Last week, a family of oystercatchers was discovered on the Deutsche Bahn staging area! This area is used to provide the materials (soil, FMI, concrete etc.) removed by work on the track for the WHV-OL extension line. There is a lot of traffic here from construction machinery, lorries and tractors for the delivery and removal of tws.> 1,000 tonnes of waste per day. Due to [...]