M&P Hagen: Major project for the electrification of a railway line


DB Netz AG is currently planning the electrification of the entire route as part of a major project along a 20 km section of the 2263 railway line from Wesel to Bocholt. The electrification is being carried out by installing overhead contact line systems (OLA). The OL masts will generally be founded on piles. In addition, it is planned to construct side paths along the track systems. [...]